SFC MDF-2 Production Plant
SFC · Industrial Zone, Türkiye
SFC MDF-2 Production Plant
Delivered in a Turkish industrial zone for SFC — MDF-2 production-plant construction designed to the requirements of a modern wood-panel production line.
The scope covered the main production building, pressing areas, raw-material and finished-product stock sections, administrative building and social areas — delivered as one integrated contract. In-plant logistics flow and machine layout were optimised for high production efficiency.
Atahan İnşaat's cumulative experience with MDF-line plants enabled this project to be delivered on schedule and at the required quality standards.
Gallery · Site
Let's build
together.
Get in touch for a detailed proposal for your industrial project. Response time: 2 business days.





